Custom made installation 500kWe

10 March 2022

Release of Dry Anaerobic Digestion Line to a capacity of 500kWe

The supply of BIOBOX-E conducts part of the customers greater multidisciplinary plant, which consists of two separate lines for the total production of >999 kWhe and a greenery that efficiently absorb heat and fertilizer produced by these lines during their process of biodegradable waste treatment.

With this custom made line alone, approx. 14,000 tons of certain mixtures of biodegradable fiber including organic waste will annually be processed into hygienized and homogenized soil improvers for a period of more than 20 years, generating approx. 80,000MWh of green electricity directly supplied to the electricity grid during that whole period.

 

Project specs

  • Plant location: Greece
  • Process: Dry anaerobic thermophilic digestion
  • Digester: Plug flow 1 x 750 m3
  • Lagoon: 4-month storage 1 x 2.800 m3
  • Surface: – m2
  • Footprint: – m2

 

Operation specs

  • Capacity : 14.000 tons p.an.
  • Biogas produced : 2.000.000 m3 p.an.
  • Electricity production : 4.000 MWh p.an.
  • Heat production: 5.600 MWh p.an.
  • WasteEnergy SA: Monitors & Maintains the line